Automated Certificate Retrieval & Delivery (NYC Local Law 33)
Client
GlobalRetail Inc.
Industry
eCommerce & Retail
Region
North America & Europe
Challenges
- Manual “click & print” process for downloading DOB energy grade certificates
- No centralized system for bulk certificate retrieval and tracking
- Time-consuming portal visits for each individual property
- Physical assembly and mailing of compliance notices
- Limited coordination across large property portfolios
- High operational effort with low scalability
- Delays in ensuring timely and organized compliance delivery
Image Section


Goals & Objectives
End-to-End Automation
Automate the entire lifecycle from DOB certificate retrieval to final physical delivery without manual intervention.
Reduce Manual Processing
Minimize labor-intensive tasks to eliminate delays, reduce shipping errors, and improve operational accuracy.
Real-Time Status Tracking
Enable transparent tracking of certificate progress across operational workflows with live updates.
Automated Certificate Retrieval
Implement web automation to detect and download new energy grade certificates directly from the DOB portal.
Integrated Logistics & Documentation
Automatically generate FedEx shipping labels, attach documentation, and prepare print-ready delivery packages.
Centralized Workflow Ecosystem
Unify Dropbox storage, FedEx logistics, and Asana task management into one system with live dashboards to monitor bottlenecks and coordination.
Solution
- Custom web bots watch the DOB portal and get certificates immediately upon issuance.
- The system generates FedEx shipping labels automatically and bundles them with the certificate to make one print-ready PDF that can be shipped immediately.
- A backend integration layer archives files in Dropbox, tasks get updated in Asana, and FedEx APIs return tracking numbers.
- A real-time command centre allows management to monitor process stages, identify stalled tasks and dynamically assign cross-functional resources.
- Workflows by department are standardised for better task assignment and security.
Results
70%
Reduction in Manual Labour
100%
Real-Time Lifecycle Visibility
85%
Improved Cross-Team Collaboration
70%
Faster Turnaround Time
Technologies Used

It is a long established fact
Iusto quia perspiciatis inventore tempora. Velit vitae tempora et laborum id soluta est ut laboriosam. Eveniet possimus autem ratione aliquid in sunt tempora. Amet rerum suscipit distinctio voluptas. In quis voluptas necessitatibus et aut dolor ut quod. Sapiente et adipisci tenetur voluptatibus qui.